CONSTRUCTION

Full-surface gap compensation for steel structures.

MM1018 — The Liquid-Shim® compensates for gaps and surface irregularities in steel connections, creating a perfect force- and form-fit for reliable load transfer.

THE PROBLEM – GAPS & TOLERANCES

Gaps compromise load transfer

Tolerances, uneven surfaces and gaps are common challenges in steel structures. Manufacturing tolerances, installation deviations, thermal deformation and corrosion damage can create irregular contact surfaces and gaps between structural components.

These gaps can compromise structural integrity, prevent uniform load transfer and increase the risk of crevice corrosion. Reliable, full-surface gap compensation is therefore essential to ensure the safety, durability and long-term performance of steel structures.

THE SOLUTION

MM1018 – The Liquid-Shim®

A high-performance metal-polymer material designed to compensate for gaps and surface irregularities in steel connections. It adapts perfectly to any contact surface without requiring precisely machined shims.

  • Creates full bearing contact and a perfect force- and form-fit connection
  • High compressive strength, fatigue strength and low long-term creep susceptibility
  • Supports reliable load transfer across the whole surface
  • Enables efficient installation and reduces extensive surface preparation

APPLICATION

Two ways to apply

As a fluid – injected directly into an existing gap.

As a putty – applied to the contact surface with a putty knife before the two components are assembled.

Both methods let the material compensate for gaps and surface irregularities, creating a continuous, full-surface connection for reliable load transfer.

PRODUCTS

MM1018 products

Every DIAMANT system starts with a real production problem – and ends with a
measurable business result.

#1866

MM1018 FL

Flowable/liquid version — injected directly into the gap for self-levelling, full-contact bedding.

↓ TDS / Datasheet

#1436

MM1018 P

Paste version — applied with a putty knife for vertical, overhead and formed applications.

↓ TDS / Datasheet

ACCESSORIES

Accessories & Kit

Mixing and application accessories. See the accessories datasheet for the full list.

↓ TDS / Datasheet

REFERENCES

Proven on real projects.

Wehr Neuwerben/Germany

· MM1018 – The Liquid-Shim®

Strong together for an extraordinary construction project!

When 160 metric tons of precision meets technical expertise. During the modernization work on the Neuwerben flood control structure, our [...]

Washington D.C., | USA

· MM1018 - The Liquid-Shim®

MM1018 FL on Interstate 395 in Washington, D.C.

Earlier this year, our client, Fort Myer Construction, asked itself: How can we ensure uniform load transfer despite uneven or [...]

Jammu, Kashmir/India

· MM1018 – The Liquid-Shim®

Precision for a 55-year-old stacker and backhoe in the U.S.

DIAMANT had the opportunity to assist with the replacement of the swivel track on a 55-year-old stacker-reloader at Cleveland Cliffs [...]

Jammu, Kashmir/India

· MM1018 – The Liquid-Shim®

Chenab Bridge – Gap compensation with MM1018 on the world’s highest railway bridge

Engineers at the Bridge contractor upon intense discussions with the bridge designers and DIAMANT engineers decided upon the use of [...]

Wolfsburg, Germany

· MM1018 – The Liquid-Shim®

Innovative solution for the bell tower of Christ Church in Wolfsburg thanks to MM1018

During the renovation of the bell tower of the Christus Church in Wolfsburg, installing the required fitting bolts on the [...]

Kelheim, Germany

· MM1018 – The Liquid-Shim®

Door renovation with MM1018 for precise alignment of mortise hinges

In 2014, the Kelheim lock was modernised as part of a comprehensive renovation project. A key component of this was [...]

Brandenburg, Germany

· MM1018 – The Liquid-Shim®

Efficient installation of wedge blocks at the Wusterwitz lock with MM1018

As part of the project at the Wusterwitz lock in Brandenburg, our MM1018 FL – The Liquid-Shim® – was specifically [...]

Zurich, Switzerland

· MM1018 – The Liquid-Shim®

Renovation of the Hammermuehle viaduct in Zurich with MM1018

The section of the N1 motorway between Effretikon and Ohringen connects the cities of Winterthur and Zurich and is one [...]

Gardelegen, Germany

· MM1018 – The Liquid-Shim®

MM1018 secures the commissioning of an Enercon hybrid tower in Gardelegen

Modern wind turbines with hub heights of up to 150 metres enable significantly higher energy yields thanks to hybrid tower [...]

Lusikisiki, South Africa

· MM1018 – The Liquid-Shim®

Gap filling at Msikaba Bridge

Another impressive example of the use of MM1018 is its application on the Msikaba Bridge in South Africa. The cable-stayed [...]